Loading…
Loading…
506 results • Best match
Raising of Plantation Work Under Clear felled area (Teak Model AR Model-06) during 2025-26(2500pits/Ha.)
Raising of Plantation Work Under Clear felled area (Teak Model AR Model-06) during 2025-26(2500pits/Ha.)
Raising of Plantation Work Under Clear felled area (Acacia Model AR Model-06) during 2026-27(1600pits/Ha.)
Raising of Plantation Work Under Clear felled area (Acacia Model AR Model-06) during 2026-27(1600pits/Ha.)
Raising of Plantation Work Under Clear felled area (Acacia Model AR Model-06) during 2026-27(1600pits/Ha.)
Raising of Plantation Work Under Clear felled area (Acacia Model AR Model-06) during 2026-27(1600pits/Ha.)
A/mtc of L/s work in Road Side Plantation in sector-34, Ambala for the year 2026-27.(Anti termite treatment of mature trees and hiring of brush cutter etc. and all other work contingent thereto.)
[26.54.2]Anti termite treatment of lawns, mature trees. 2. Treatment around mature trees by digging holes 30 cm deep and 4 cm dia, 6 to 7 holes around tree using 1% chemical emulsion of Chlorpyriphos 20% E.C using minimum 150 ml insecticide per plant.
two year maintenance of Plantation work in Mattihalli F. Sy. No. 4 in Clear felled area-ANR-Model-2.
two year maintenance of Plantation work in Mattihalli F. Sy. No. 4 in Clear felled area-ANR-Model-2.
Construction of Toilet Block at Sericulture Mirgund
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of Soil.