Loading…
Loading…
605 results • Best match
Contruction of Block Level Stadium under Bijepur Block Without Indoor hall_building
Plantation of Trees, Shrubs, and Hedge at site I c watering and removal of unserveiceable material s as per direction of officer in charge excluding cast of plant and water Trees Plant
AS PER TENDER NOTICE LOT 01
Plantation of Trees, Shrubs, Hedge, ground covers and seasonal plants at site i/c watering and removal of unsaverieable material’s as per direction of officer in charge (excluding cost of plant & water). Trees plant
Construction of building balance work
25.2 : Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including: a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including: b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers. c) Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment , including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass. d) Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight. e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineerin- Charge. Note:- 1. The cost of providing extruded aluminium frames, shadow boxes, extruded aluminium section capping for fixing in the grooves of the curtain glazing and vermin proof stainless steel wire mesh shall be paid for separately under relevant items under this sub-head. However, for the purpose of payment, only the actual area of structural glazing (including width of grooves ) on the external face shall be measured in sqm. up to two decimal places. Note:-2. The following performance test are to be conducted on structural glazing system if area of structural glazing exceeds 2500 Sqm from the certified laboratories accreditated by NABL(National Accreditation Board for Testing and Calibration Laboratories), Department of Science & Technologies, India. Cost of testing is payable separately. The NIT approving authority will decide the necessity of testing on the basis of cost of the work, cost of the test and importance of the work. Performance Testing of Structural glazing system Tests to be conducted in the NBL Certified laboratories 1. Performance Laboratory Test for Air Leakage Test (-50pa to – 300pa) & (+50pa to +300pa) as per ASTM E-283-04 testing method for a range of testing limit 1 to 200 mVhr” 2. Static Water Penetration Test. (50pa to 1500pa) as per ASTME- 331-09 testing method for a range up to 2000 ml.” 3. Dynamic Water Penetration (50pa to 1500pa) as per AAMA 501.01-05 testing method for a range upto 2000 ml” 4. Structural Performance Deflection and deformation by static air pressure test (1.5 times desing wind pressure without any failure) as per ASTME-330-10 testing method for a range upto 50 mm” 5. Seismic Movement Test (upto 30 mm) as per AAMA 501.4-09 testing method for Qualitative test” Tests to be conducted on site 6. Onsite Test for Water Leakage for a pressure range 50 kpa to 240 kpa (35psi) upto 2000ml”Designing, fabricating, testing, protection, installing and fixing in position semi(grid) unitized system of structural glazing (with open joints) for linear as well ascurvilinear portions of the building for all heights and all levels, including:a) Structural analysis & design and preparation of shop drawings for the specifieddesign loads conforming to IS 875 part III (the system must passed the proof testat 1.5 times design wind pressure without any failure), including functional designof the aluminum sections for fixing glazing panels of various thicknesses, aluminiumcleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clampsetc., structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmokeseals, microwave cured EPDM gaskets for water tightness, pressureequalisation & drainage and protection against fire hazard including:b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3Dimentional movement for achieving perfect verticality and fixing structural glazingsystem rigidly to the RCC/ masonry/structural steel framework of building structureusing stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetalliccontacts with nuts and washers etc. of stainless steel grade 316, of the requiredcapacity and in required numbers.c) Providing and filling, two part pump filled, structural silicone sealant and onepart weather silicone sealant compatible with the structural silicone sealant ofrequired bite size in a clean and controlled factory / work shop environment ,including double sided spacer tape, setting blocks and backer rod, all of approvedgrade, brand and manufacture, as per the approved sealant design, within and allaround the perimeter for holding glass.d) Providing and fixing in position flashings of solid aluminium sheet 1 mm thickand of sizes, shapes and profiles, as required as per the site conditions, to seal thegap between the building structure and all its interfaces with curtain glazing tomake it watertight.e) Making provision for drainage of moisture/ water that enters the curtain glazingsystem to make it watertight, by incorporating principles of pressure equalization,providing suitable gutter profiles at bottom (if required), making necessary holesof required sizes and of required numbers etc. complete. This item includes costof all inputs of designing, labour for fabricating and installation of aluminium grid,installation of glazed units, T&P, scaffolding and other incidental charges includingwastages etc., enabling temporary structures and services, cranes or cradles etc.as described above and as specified. The item includes the cost of getting all thestructural and functional design including shop drawings checked by a structuraldesigner, dully approved by Engineer-in-charge.The item also includes the cost of all mock ups at site, cost of all samples of theindividual components for testing in an approved laboratory, field tests on theassembled working structural glazing as specified, cleaning and protection till thehanding over of the building for occupation. In the end, the Contractor shall providea water tight structural glazing having all the performance characteristics etc. allcomplete as required, as per the Architectural drawings, as per item description,as specified, as per the approved shop drawings and as directed by the Engineerin-Charge.Note:- 1. The cost of providing extruded aluminium frames, shadow boxes, extrudedaluminium section capping for fixing in the grooves of the curtain glazing andvermin proof stainless steel wire mesh shall be paid for separately under relevantitems under this sub-head. However, for the purpose of payment, only the actualarea of structural glazing (including width of grooves ) on the external face shallbe measured in sqm. up to two decimal places.Note:-2. The following performance test are to be conducted on structural glazingsystem if area of structural glazing exceeds 2500 Sqm from the certified laboratoriesaccreditated by NABL(National Accreditation Board for Testing and CalibrationLaboratories), Department of Science & Technologies, India. Cost of testing ispayable separately. The NIT approving authority will decide the necessity of testingon the basis of cost of the work, cost of the test and importance of the work.Performance Testing of Structural glazing systemTests to be conducted in the NBL Certified laboratories1. Performance Laboratory Test for Air Leakage Test (-50pa to – 300pa) & (+50pa to+300pa) as perASTM E-283-04 testing method for a range of testing limit 1 to 200 mVhr”2. Static Water Penetration Test. (50pa to 1500pa) as per ASTME- 331-09 testingmethod for a range up to 2000 ml.”3. Dynamic Water Penetration (50pa to 1500pa) as per AAMA 501.01-05 testingmethod for a range upto 2000 ml”4. Structural Performance Deflection and deformation by static air pressure test(1.5 times desing wind pressure without any failure) as per ASTME-330-10 testingmethod for a range upto 50 mm”5. Seismic Movement Test (upto 30 mm) as per AAMA 501.4-09 testing method forQualitative test” Tests to be conducted on site6. Onsite Test for Water Leakage for a pressure range 50 kpa to 240 kpa (35psi)upto 2000ml”
3rd year maintenance of 2024 Kottambathur Bit II Eco restoration plantation in Poongode Forest Station of Wadakanchery Range in Thrissur Division during 2026-27
Transportation of seedlings from nursery to planting site
Annual Repair And Maintenance of Miscelleneous Civil Works At I.A. Sahibabad Site-4 Distt. Ghaziabad
Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal ofunserveiceable material’s as per direction of officer in charge (excludingcast of plant & water) Hedge Plant
Annual Repair And Maintenance of Miscelleneous Civil Works At I.A. Loni Road Site-II, Ghaziabad
Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal ofunserveiceable material’s as per direction of officer in charge (excludingcast of plant & water) Hedge Plant