Loading…
Loading…
2,239 results • Best match
Advance work for Liner plantation Including Raising of PBseedlings at Indiranagar to Mallasandra in Gauribidanur Range under RSP Scheme during 2025-26
Advance work for Liner plantation Including Raising of PBseedlings at Indiranagar to Mallasandra in Gauribidanur Range under RSP Scheme during 2025-26
Plantation work in the divider built on the main road and Different places under the urban body area.
"Digging pits of size 60x60x60 cm or more as per requirement of tree planting, refilling the pit with fertile soil mixed with farmyard manure in the ratio of 4:1 by volume, providing and planting of approved quality plant of good health with branching including with or without tree guard (excluding cost of work related to tree guard), making required thala around each plant, watering, dressing, removal of rubbish and surplus earth, use of insecticide and pesticide as required, providing and fixing bamboo for keeping plant straight etc., complete. Maintenance of plant for 2 months after completion of plantation as per instruction of Engineer in charge."
Advance work , raising of plantation and maintenance of seedlings at Chikagrahara sy no 42 and 43 in Sira range-10.96Ha. RESERVED FOR SC
Advance work , raising of plantation and maintenance of seedlings at Chikagrahara sy no 42 and 43 in Sira range-10.96Ha.
Surface dressing of the ground/ land for plantation at R and R site at village Kanwa under MKD-I OC Mine of Umrer Sub Area. (Site clearance and preparatory work for MPRVVN plantation work of MKD -I OC of Umrer Sub Area).
Supply of Kraft Paper 45 GSM to the Sericulture department
Macadamization of road from Grid Station Thudi to Sericulture office
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :