Loading…
Loading…
5,198 results • Best match
Supply and installation of Air Conditioner
Supply and Installation of 1.3 to 1.7 ton, 5 star inverter type, split air conditioner
Purchase of AIR CONDITIONER(Retender)
Air Conditioner(T.S-09(1)/EP-09(1)/2025-26/DC/TVM)(DTL TVM-3 QUANTITY)
Wall mounted Split Air Conditioner
Description :Wall mounted Split Air Conditioner Type 2 Ton of specifications: (1) Classification by function : Cooling Only (2) Star rating (iseer value range) :5 Star (ISEER Value From >=5 To =5.5) (3) Compressor type as per bee star rating label : Inverter AC - Variable Speed (4) Eco-friendly refrigerant : Yes (5) Refriger ant ozone depletion potential is zero : Yes (6) Compliance to green ac related environmental friendly featur es complied :No (7) Salient features::Turbo Mode,Power Saving Mode,Self Diagnosis, Mode,Dry Mode,Cool Mode,Fan Mode,Air Swing,Timer,Sleep Mode,Auto ON/OFF,Fan Speed, Control,Power(On-OFF),Temperature Up/Down (8) Salient accessories :1 M (PVC Insulated Sheathed Cables As Per IS:694), Remote, User Manual, Warranty Card (9) Comprehensive warranty on air conditioner::machine (in years) :1 (10) Warranty on com pressor (in years): 10 (11) Optional warranty on pcb : Same As Machine Warranty (12) Number of free servi ces during the comprehensive warranty on air conditioner::machine : 2 Services Per Year (13) Installation & commissioning : With Installation Commissioning (14) Other services provided ( inclusive in the scope of su pply) : 24*7 Customer Online Service (15) Optional Accessories::Work Required (Inclusive In The Scope Of S upply: Suitable Wall Mount Stand For Outdoor Unit (16) Nominal marketing cooling capacity (in ton) : 2 Ton Make: Make- Hitachi, Samsung, LG, Voltas, godrej or similar [ Warranty Period: 12 Months after the date of delivery ] ] SSE ELECL. WHEEL CONTROL, Karnataka 10.00 Numbers Consignee RWF Inspection Details Stage Inspection Not Required
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/7011274 Dated : 24-12-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7003257 Dated : 16-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC
air conditioner 1.5 ton with stablizer
Air Conditioner 1.5 TON Split