Loading…
Loading…
39,187 results • Best match
Annual repair and Maintenance of non residence building at Manali in Distt Kullu
Annual repair and maintenance to MKCG Medical college and hospital building at BAM
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Custom Bid for Services - Round the clock routine preventive/breakdown maintenance of C&I field equipment in Boiler, TG and BOP area pertaining to C&IMD -II & C&IMD- I of all three units of 3X210 MW, ATPS, Anpara for a period of two years Similar ... Category Repair , ... Repair, Maintenance and ...
Custom Bid for Services - Round the clock routine preventive/breakdown maintenance of C&I field equipment in Boiler
Annual Rate contract for Patch Repair and Maintenance work in PWD Sub Dn. Gulabpura
eProcurement System Government of Rajasthan Created By: Nand Lal Meena Created Date/Time: 03-Jun-2026 03:11 PM Tender Title: Annual Rate contract for Patch Repair and Maintenance work in PWD Sub Dn. Gulabpura Tender ID: 2026_CEPWD_560420_2
Annual Rate contract for Patch Repair and Maintenance work in PWD Sub Dn. Asind
eProcurement System Government of Rajasthan Created By: Nand Lal Meena Created Date/Time: 03-Jun-2026 03:01 PM Tender Title: Annual Rate contract for Patch Repair and Maintenance work in PWD Sub Dn. Asind Tender ID: 2026_CEPWD_560420_1
Annual Repair and maintenance of Computers, Printers, Laptops its Peripherals and accessories, LAN System including Cable, switches and all accessories
Annual repair and maintenance of computers its Peripherals & accessories including replacement of spares (Mother Board, SMPS, SSD, HDD 500GB/1TB, RAM, Processor, Mouse, Keyboard, HDMI/VGA cable, CMOS Battery etc.) as and when required including installation of all necessary software at CE’s Office, SE (Plg) Unit, Architect Unit, and T&CP Unit for a period of one year.