Loading…
Loading…
379 results • Best match
APPOINTMENT OF ARCHITECT CUM ENGINEERING CONSULTANT (AEC) FOR PROVIDING COMPREHENSIVE DESIGN AND ENGINEERING SERVICES FOR CONSTRUCTION OF ASSEMBLY HALL CUM CULTURAL CENTRE AT RAIRANGPUR, ODISHA
APPOINTMENT OF ARCHITECT CUM ENGINEERING CONSULTANT (AEC) FOR PROVIDING COMPREHENSIVE DESIGN & ENGINEERING SERVICES FOR CONSTRUCTION OF ASSEMBLY HALL CUM CULTURAL CENTRE AT RAIRANGPUR, ODISHA (BIDDING DOCUMENT NO.: JP/C251-000-SE-T-8200/1001) (As per prefilled Schedule of Rates - Form SP-0)
APPOINNTMENT OF EXPERIENCED AND REGISTERED ARCHITECT/ ARCHITECTURAL FIRMS FOR PLANNING, DESOGN OF IMPROVEMENT TO SHRI GANESH MANDIR PREMISES AT DAULATNAGAR (MARALI), TAL PATAN DIST SATARA.
APPOINNTMENT OF EXPERIENCED AND REGISTERED ARCHITECT/ ARCHITECTURAL FIRMS FOR PLANNING, DESOGN OF IMPROVEMENT TO SHRI GANESH MANDIR PREMISES AT DAULATNAGAR (MARALI), TAL PATAN DIST SATARA. (MAHARASHTRA)
Engaging of Architect for Prepration of Detailed Drawings, Estimate for Aspirational toilet blocks and various other projects/Buildings in Sh Anandpur Sahib for 2 Years.
Selection of Architect Consultant for Providing Detailed Project Report for Development of Integrated Art and Craft Village at Guhaladihi under Baripada Block in Mayurbhanj District
Redevelopment of RBI residential complex for Staff class IV at mahim Mumbai SH Hiring of inspection vehicle for Chief Architect office of SDG CPWD Mumbai
1 Hiring of inspection vehicle for Chief Architect office of SDG CPWD Mumbai 745604 Above 5.00 782,884.20
Appointment of Project Management cum Architecture Consultant for the work of Construction of new Panchayat Ghar in property bearing survey no.259/0 at Village Panchayat Quelossim, Mormugao Goa purpose of providing project management...
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Percentage to be entered by the Bidders. The maximum acceptable percentage for providing consultancy services shall not exceed 5.00% of the project cost GST (If applicable in Percentage) GST Amount in Rs. P HSN / SAC Code TOTAL AMOUNT excluding taxes in Rs. P TOTAL AMOUNT including taxes Rs. P TOTAL AMOUNT In Words