Loading…
Loading…
25,504 results • Best match
8. Construction of Road (Bitumen) From Pait Roundhalwadi Road to Manisha Shridhar Dube Ghar at Village Pait Tal-Khed
Providing and constructing 75 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubble obtained by blasting) heating and spraying the bitumen of specified grade @ 2 Kg/sqm, spreading 12 mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface. (VG-30 bulk bitumen rates are considered to arrive at rates)
Construction of Plastic Bitumen Blue Road from Babul Mitra house to Palash Ghosh house at Roypara ID 127317922
Construction of Plastic Bitumen Blue Road from Babul Mitra house to Palash Ghosh house at Roypara ID 127317922
Const of bitumen plastic road from basar mondal house to naser mallik house at Ajaharnagar ACTIVITY ID- 127211422
Const of bitumen plastic road from basar mondal house to naser mallik house at Ajaharnagar ACTIVITY ID- 127211422
Maintenance and Repairing work of PK Collage to Depal Road from ch. 4.00 kmp to 5.00 kmp and 3.50 kmp to 4.00 km. in patches due to excessive rainfall by repairing potholes, 20 mm Premix Surfacing and Premixed Seal Coat (Type B) in patches
Maintenance and Repairing work of PK Collage to Depal Road from ch. 7.00 kmp to 7.50 kmp and 8.00 kmp to 9.00 km. in patches due to excessive rainfall by repairing potholes, 20 mm Premix Surfacing and Premixed Seal Coat (Type B) in patches.
Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone gregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by any suitable arrangements, laying the mixture uniformly over the surface, including line, grade and level to serve as wearing course on a previously prepared base, including mixing in Mobile Hot Mix Plant (Light Duty) and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, inished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the aggregates to required temperature and including the hire charges of Mobile Hot Mix Plant (Light Duty) and other machinery, pay of operators, cost of fuel and lubricants etc. complete to be followed by seal coat of either Type A or Type B as per Technical Specification Clause 508 for Rural Roads of MORD.
Recovery and reconstruction work to the Gurung Basti Gulma Station road from 3.0 kmp to 9.91 km by surfacing work under NBCD, PWD in the dis of Darjeeling for mending up damages occurred due to heavy rain fall during the period from 25.08 to 18.09.25