Loading…
Loading…
25,504 results • Best match
(SH- Providing and laying 25 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 0/00 to 2/00)
Providing and applying tack coat with Bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.225 kg. (zero point two two five kilogram) per Square metre on the prepared granular surface treated with primer and cleaned with hydraulic broom as per M.O.R.D. technical specifications section 500 and as per the directions of Engineer-in-Charge including carriage of material within all leads , lifts and other incidentals and to the entire satisfaction of the Engineer-in-Charge .The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government.
SH- Providing and laying 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 0/00 to 1/00)
Providing and applying tack coat with Bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.225 kg. (zero point two two five kilogram) per Square metre on the prepared granular surface treated with primer and cleaned with hydraulic broom as per M.O.R.D. technical specifications section 500 and as per the directions of Engineer-in-Charge including carriage of material within all leads , lifts and other incidentals and to the entire satisfaction of the Engineer-in-Charge .The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government.
(SH- Providing and laying 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 1/00 TO 2/500)
Providing and applying tack coat with Bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.225 kg. (zero point two two five kilogram) per Square metre on the prepared granular surface treated with primer and cleaned with hydraulic broom as per M.O.R.D. technical specifications section 500 and as per the directions of Engineer-in-Charge including carriage of material within all leads , lifts and other incidentals and to the entire satisfaction of the Engineer-in-Charge .The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government.
Construction of bitumen road from Satberia Airtel Tower Gora to Subirchak Bhanga Bandh via Buno Pukur Adhibasi Para Pandit Para and Satberia High School Under Kamarpukur Gram Panchaya Within Goghat-ll Dev. Block. Length 3.570 km
Construction of bitumen road from Satberia Airtel Tower Gora to Subirchak Bhanga Bandh via Buno Pukur Adhibasi Para, Pandit Para and Satberia High School Under Kamarpukur Gram Panchaya Within Goghat-ll Dev. Block. Length 3.570 km
Repair potholes of asphalt road Temghar to Nimbawali
Ward07 Nagappa Naik Rd santhosh devadiga Rd Asphalt