Loading…
Loading…
26,443 results • Best match
Providing hard surface in front of Workshop road at Workshop complex.
Excavation in water bound macadam road including stacking the serviceable and unserviceable material separately and disposal of unserviceable material lead upto 50m and lift upto 1.5 m disposed materials to be neatly dressed including minor tools, Water charges, Contractors Profit, Labour Welfare Cess, GST etc complete.
Providing cc surface road at ward 13 nethaji street
Providing Bitumen Pad 12mm thick for Expansion joint including cost and conveyance of all other labour and material charges to site etc., complete.
REPAIRING OF ROAD SURFACE / FOOTPATH AT DIFFERENT PLACES IN WARD NO- 042
Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone.
Renewal BT Surface Road alli main in ward 7
Road marking with hot applied thermoplastic compound with Reflecterising glass beads on bituminous surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including refletoring glass beads at 250gms as per sq.m area thickness of 2.5mm exclusive of surface applied glass beads as per IRC 35. The finished surface to be level uniform and free from stresaks and holes.
Renewal BT Surface Road at Engineeriyar Nagar in ward 8
Road marking with hot applied thermoplastic compound with Reflecterising glass beads on bituminous surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including refletoring glass beads at 250gms as per sq.m area thickness of 2.5mm exclusive of surface applied glass beads as per IRC 35. The finished surface to be level uniform and free from stresaks and holes.
Renewal BT Surface Road at Engineer nagar at ward 8
Road marking with hot applied thermoplastic compound with Reflecterising glass beads on bituminous surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including refletoring glass beads at 250gms as per sq.m area thickness of 2.5mm exclusive of surface applied glass beads as per IRC 35. The finished surface to be level uniform and free from stresaks and holes.