Loading…
Loading…
27,152 results • Best match
REPAIRS TO ROAD SURFACE TO BE DISTURBED BY WATER SUPPLY DEPARTMENT AT 3/1/79, BELIAGHATA MAIN ROAD IN WARD NO-35
Renewal of B.T. Surface at Chidhabaram Nagar Main road ( from Madurai road to Tamirapathy Engineering college) Ward in 1.
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of al lmaterials to CMP site ,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uni form thickness of 50mm with paver to the specifi degrades and cross sections and compacted by Vibratory /Pneumatic Rollert othere quired density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory/ Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Repairing of road surface by hot mix from Nari Sisksha School to 295/2K A.P.C. Road in Ward No-28
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.)
Repairing and renovation of damaged road surface to prevent road dust at different areas in ward no. 27 under Borough-IV
Earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post work
IMPROVEMENT OF ROAD SURFACE AND LOWERING AT 14, SASTITALA ROAD AND OTHER PLACES IN WARD 30. TO BE DISTURBED DUE TO LAYING OF THE SEWER
Earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post work
- IMPROVEMENT OF ROAD SURFACE BY LAYING CEMENT CONCRETE AT 226A/36, BAGMARI ROAD AND ITS SURROUNDING AREA IN WARD NO-14