Loading…
Loading…
27,286 results • Best match
Renewal of BT Surface Roads and CC Roads due to damages caused during laying of UGSS and Water Supply line
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cu.m of 26.50-13.20mm, 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Construction of Surface Drain at Shikdar para Road and Upen Mitra road at Ward No- 17 under Rajpur Sonarpur Municipality.
REPAIRS TO ROAD SURFACE TO BE DISTURBED BY WATER SUPPLY DEPARTMENTAT 2/H/15 BELIAGHATA MAIN ROAD IN WARD NO-35
REPAIRS TO ROAD SURFACE TO BE DISTURBED BY WATER SUPPLY DEPARTMENT AT 3/1/93 BELIAGHATA MAIN ROAD IN WARD NO-35
Providing Bituminous Surface at KK Road widening from PJN road junction to williams layout junction in Villupuram Municipality
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Repairing of road surface of link Road at Domjur Jele para More in the District of Howrah during the year 2025 2026