Loading…
Loading…
28,355 results • Best match
MAINTENANCE OF DAMAGE ASPHALTUM ROAD SURFACE TO PREVENT ROAD DUST NEAR PREMISES 302/1,205A NSC BOSE ROAD,8/49 NETAJINAGAR, 52 SHAIDNAGAR ETC IN WARD NO-98, BR-X
Renewal to BT Road Surface Mandhi thoppu josheph nagar main road 115094S2280, Josephnagar main Street Road 115094R6862, Josheph nagar 1st cross 115094S2285, Josheph nagar 2nd 115094S2286,
... 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central ...
Providing BT Surface by using Paver machine at Ponnagaram Road 127041R505Kothandaramar kovil st127032R383 127032R385 Ambalapuli bazaar Road 127028R336 127022S158 127022R293 and Somaiyapuram street 127010R147 and Providing Cement Concrete Road
... 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central ...
Providing BT Surface Road at Kumarapuram stadium opp Road Kumarapuram DSP office Road Kumarapuram amma jeya street Kumarapuram amma anbu street Kumarapuram amma kodi street Kumarapuram
... to 170 degree celcious in the centeral hot mix plant, mixed well with 45.27 Kgs of hot bitumen VG30 Bitumen (160 degree celcious) 60/70 grade for premixing per 10sqm to lay 30mm compacted thick... Corporation will be recovered) and conveyance of all materials to CMP site, heating the bitumen and agregates to the required tonnes capacity conveying the mix by tipper trucks to paver ...
Improvement work of providing cement concrete road surface in left side SE office entrance road,main road to turn on the left side and portico portion in the SE Office Building REDC, Ramnad
Supplying and filling of Red gravel for the road portion over the WBM and compacting using hand roller, labour for filling, watering and consolidation, including cost of all materials, lead, lifts, labour, etc., complete.
Package -3 Relaying of BT Surface at vengikkal-Thendral nagar main road (04002AR920) , om sakthi nagar main road (04002AR921) Kilnachchipattu main road (04004AR922) in Tiruvannamalai City Municipal Corporation.
... 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ...