Loading…
Loading…
25,355 results • Best match
The construction of new road between CH 220 m incorporated where RCC Road surfacing with PCC foundation and Quarry muck filling is proposed throughout the length of road. As the road from CH 0 to 70 m is a low lying area and to avoid water
MAINTENANCE OF DAMAGE AND PORTHOLES FREE ROAD BY BITUMINOUS SURFACEING TO PREVENT ROAD DUST AT 42/31 TO 42/45, B D 2ND LANE, 30, 60, 72, R K CHATTERJEE ROAD, 4D DHARMATALA ROAD AND ITS SURROUNDING IN W/67
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface. (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.)
Repair and Maintenance of Road from Naya Bazar (Bank Dara) to Baluwa Dara and Bituminous Surfacing from Baluwa Dara to Dokandara at P.B. Road, Kurseong (Length 2.10 Km)
Black top bitumen road from Morapai Church to connector of Sangrampur- Mandirbazar road
eProcurement System of Government of West Bengal Created By: Pradip kumar Das Created Date/Time: 22-Dec-2025 12:12 PM Tender Title: Black top bitumen road from Morapai Church to connector of Sangrampur- Mandirbazar road Tender ID: 2025_PRD_944981_21
MAINTENANCE OF DAMAGE ROADS , POTHOLES WITH BITUMINOUS SURFACING TO PREVENT ROAD DUST NEAR D/14, E/113/11 RAMGARH, 19/5A/1 D.P.P ROAD, 8/1D B.G. BYE LANE, 364/32/1 N S C BOSE ROAD ETC IN WARD 100, BR.X
Sijgram Village Link Road from 0.00 Kmp to 0.90 Kmp and Salar-Bharatpur Road to Sijgram Link Road from 0.00 Km to 1.89 Km and 2.00 Km to 3.50 Km surfacing work under Murshidabad Highway Division No.II during the year 2025-26