Loading…
Loading…
422 results • Best match
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 3.15-5.15 kmp. from both side of KNI Avenue and both flank of VIP Road Flyover under Baguihati Highway Sub Division of Barasat Highway
Day to day sweeping the compound road pathways (mettalled or earthen) and deposited the garbage, plastic or similar identical waste materials in the centre of the formed working zone and removal and disposal of the same in conformity with the Municipal/ Corporation rules as per direction of Engineer-in-charge from 0.00 to 1.00 kmp. on both side on KNI Avenue under Baguiati Highway Sub-Division of Barasat Highway Division No-I in the district of North 24 Parganas for the period of one year. 104000.00 Sq. M/ day Total Area= [365x104000]÷2 =18980000 Sq. M
Bio Medical Waste Management Service - Per bed basis - Collection, Lifting, Transportation, Treatment, Disposal; Medical colleges & institutions; White puncture proof containers, Face Mask, Gloves, Apron, PPE kits, Goggles, Chemical disinfectants, In..
Custom Bid for Services - Up keeping of NSDF comprising of ensuring functionality of drains surrounding NSDF, back filling with sorbent material and closure of radioactive waste disposal modules at BARC, Trombay as per Technical specifications Similar Category Facility Management Services - LumpSum Based Facility Management Service - Outcome Based
back filling with sorbent material and closure of radioactive waste disposal modules at BARC
Horticulture Service - Lumpsum based - Routine maintenance of Horticulture works such as lawns flower beds shrubs hedges creeper rockery etc by Watering Mulching Pruning Trimming Spraying Manuring at regular intervals Weeding Lawn mowing; Propaga.., ... - Disposal of ... Horticulture waste similar ... or waste material ...
Horticulture Service - Lumpsum based - Disposal of moorum building rubbish malba Horticulture waste similar unserviceable dismantled or waste material by mechanical transport including loading; Propagation of Horticultural Crops
Day to day sweeping the main carriageway, service road and footpath and removal and disposal of waste materials from 3.15-5.15 kmp. from both side of KNI Avenue and both flank of VIP Road Flyover under Baguihati Highway SubDivision of BHD-I
Day to day sweeping the compound road pathways (mettalled or earthen) and deposited the garbage, plastic or similar identical waste materials in the centre of the formed working zone and removal and disposal of the same in conformity with the Municipal/ Corporation rules as per direction of Engineer-in-charge from 0.00 to 1.00 kmp. on both side on KNI Avenue under Baguiati Highway Sub-Division of Barasat Highway Division No-I in the district of North 24 Parganas for the period of one year. 104000.00 Sq. M/ day Total Area= [365x104000]÷2 =18980000 Sq. M
Day to day sweeping the main carriageway, service road, footpath parking area and removal disposal of waste materials from 5.15-8.05 kmp. from both side of KNI Avenue under Baguiati Highway Sub Division of Barasat Highway Division No I for the Six
Day to day sweeping the compound road pathways (mettalled or earthen) and deposited the garbage, plastic or similar identical waste materials in the centre of the formed working zone and removal and disposal of the same in conformity with the Municipal/ Corporation rules as per direction of Engineer-in-charge from 0.00 to 1.00 kmp. on both side on KNI Avenue under Baguiati Highway Sub-Division of Barasat Highway Division No-I in the district of North 24 Parganas for the period of one year. 115600.00 Sq. M/ day Total Area= [365x115600]÷2 =21097000 Sq. M