Loading…
Loading…
2,094 results • Best match
Construction of Control Room Building, Foundation, Cable Trench, Compound Wall, RCC Road, Borewell etc. at 66kV Dungari (Isarwada) S/S Ta. Idar, Dist. Sabarkantha under Himmatnagar Circle.
Few electrification works remaining at the EWS flats in Pattuvam. Work for the installation of 3 panel boards, a submersible pump for borewell and other rectification works
OD52166/2026-2027:Supply, Installation , Testing and commissioning of of 3.70 kw , 5 Hp, 38 stage Three phase Submersible bore well pump standard make and model with the following specification Pump Type (Installation) Submersible,Pump Type (Application),Power (In KW) 3.70, Power (In HP) 5.00, Delivery Size (in mm)38, Rated Voltage (Volts) 415, Speed (rpm) 2800, Phase 3, Frequency (in Hz) 50, No. of Stages 38, Product Dimensions Approximately 2695 x 226 x 226 MM;51 KG, Head Minimum (in m) 10,Head Maximum (in m) 296, Discharge Minimum 15 LPM, Discharge Maximum 90 LPM, Impeller Noryl, Motor Body Stainless Steel,Pump Shaft Stainless Steel, Sealing Oil Seal, Net Contents Pump set comprising 1 Pump, 1 Motor,op, good quality including required 3 Phase flat cable , rop, good quality HDPE Pipe & all other accessories except three phase starter for operation of 5 hp bore well pump Including all connection for operation of pump , hire charges, charges for tools and plants required for the works as per direction of Engineer in charge ( approximate depth 180 meter - 6 inch bore )
Providing Irrigation facilities through Borewell to the land of Kamappa Huded of Chikkasanshi village in Bagalkote Taluka of Bagalkote District. (TSP 2025-26) (Reserved to category 2A)
Providing Irrigation facilities through Borewell to the land of Kamappa Huded of Chiksamshi village in Bagalkote Taluka of Bagalkote District. (UNDER TSP FOR 2025-26)
Estimate for boring and installation of new Tubewell for provision of water to offices and canal colony of Ropar Canal and GW Div.
Provision for Sterilisation of tubewell with sodium hypochorlide/chlorination of well as per IS code 2800: 2019 complete job. The well shall be disinfected or sterilized as per IS code 2800:2019 or latest, after the development by pump and before the final test. All wells regardless of the use should be sterilized on completion to prevent or retard the growth of corrosion or incrustation fostering organisms. This should be done by introducing chlorine into the water in the well and immediate aquifer surrounding the well .The volume of water in the screen and casing should be estimated and sufficient chlorine added to yield for water with chlorination of 1000 ppm. The solution should be poured into the well and thoroughly mixed in the well by surging with pump. The solution should remain in the well for at leaset 6 hours during which it should be surged at about 2 h interval. After expiration of contact time , the well should be pumped initially back into the well for abour 30 minute and late to waste until there is little of no odour or taste of chlorine in the discharged water . IT has been found that using hypochlorite is of 10% concentration, the requirement of hypochlorite is 10 litre for every cubic meter of water in the well to produce.
Yearly Rate Contract for Construction of Tubewell and providing and fixxing Panghat accessories in complete area of P.S. Delwara
Yearly Rate Contract for Construction of Tubewell and providing and fixxing Panghat accessories in complete area of P.S. Delwara
Boring of 10 Nos. deep tubewell at various locations in Matia Mahal Constituency, AC-21 under EE(C)-14.
Boring of 10 Nos. deep tubewell