Loading…
Loading…
1,926 results • Best match
Drilling of ORDINARY Tube well
Drilling of DTH. Tube well
Tasrouli village, Drilling of tube well (in lieu of abandoned tube well) of Distt. Ambala
Development of t/well by Over-pumping unit having suitable submersible pump for development of tubewell to ensure sand free discharge. All the equipment including POL and labour required for carrying out pumping tests but not limited to the following shall be arranged by the contractor at his own cost complete in all respect to the satisfaction of Engineer-in-charge: i) A suitable pump and prime mover (since power is not available at the well site). ii) Measuring devices for time, discharge and V-Notch orifice method water level recorder (digital water meter recorder/ steel tape engraved). iii) The contractor shall collected water sample in the presence of SDE/JE. This water samples should be handed over to PHED for further chemical analysis in Public Health Lab.
Development of roads and Construction of drains in ward no 12 near Tumbukere, ward 14 in Badiger Oni and Construction of drains in ward no 01 near Pattihal road and Drilling of Borewell in ward no 05 and 12 and installing pipelines, power pumps and panel boards to it in M K Hubli TP of Kittur Constituency
Development of roads and Construction of drains in ward no 12 near Tumbukere, ward 14 in Badiger Oni and Construction of drains in ward no 01 near Pattihal road and Drilling of Borewell in ward no 05 and 12 and installing pipelines, power pumps and panel boards to it in M K Hubli TP of Kittur Constituency
Fatehgarh village, Installation of tube well (in lieu of abandoned tube well - No. 2) of Distt. Ambala
Development of t/well by Over-pumping unit having suitable submersible pump for development of tubewell to ensure sand free discharge. All the equipment including POL and labour required for carrying out pumping tests but not limited to the following shall be arranged by the contractor at his own cost complete in all respect to the satisfaction of Engineer-in-charge: i) A suitable pump and prime mover (since power is not available at the well site). ii) Measuring devices for time, discharge and V-Notch orifice method water level recorder (digital water meter recorder/ steel tape engraved). iii) The contractor shall collected water sample in the presence of SDE/JE. This water samples should be handed over to PHED for further chemical analysis in Public Health Lab.
CONSTRUCTION OF HAND PUMP/TUBE WELL
CONSTRUCTION OF TUBE WELL IN P.S. BANERA AREA ( G-Schedule Enclosed )
Installation of 21 Nos of hand bore Tube well with soak pit a)10 Nos Handbore Tube well at Deogaon GP b) 10 Nos Handbore Tube well at Deogaon GP, Jhar Beltali Mouza c)1 no Handbore Tube well near the HO Sanjib Roy at Jateswar II GP within Falakata
Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore.(a) For depth upto 150 metre.