Loading…
Loading…
2,107 results • Best match
Operation and maintenance of 106 nos. Integrated water supply scheme of Basanti Block under Canning Sub-Division under Alipore Division, P.H. Engineering Dte. (for 06 months) (2nd Call)
Surging of existing tube well with chemical treatment and bucket wash (prior to use of compressor machine) and developing the tube well with compressor machine at least 3 (three) days at 8 (eight) hours per day till the yield is obtained at least by 75% of the total specified yield of the tube well (measured by 'V' notch tank) and draw down is within the permissible limit of 10% variation and water so obtained after such washing and developing will be free from sand and bacteria for which test report from the Public Analyst is to be obtained. (The rate is inclusive of all labour and materials including hire charges of tools and plants and cost of materials.) (a) For tube well from 40 mm to 100mm top enlarged to have yield from 1500 to 3000 gallons per hour as per size and yield.
Deriling of TW Calyx/ Crawler Machine In Diffrantion Villages Barwani Dist
Disinfection of tube well using bleaching powder solution as per the direction of the Engineer in Charg including the cost of bleaching powder and labour etc. complete
(118) Drinking of water Facility at GPS Ratanpura, Sevariya
PWD Integrated Building BSR 2022 Part "A" Part 1- Tube Well Construction to tube well from ground levels and upto 100 meter depth and above to accommodate housing and assembly pipe of following sizes in all types of alluvium strata by percussion/ rotary drilling method and with gravel as per IS : 4097-1967 and packing as per IS : 2800 ( Part I & II ) 1979 as amended upto date ( the work includes the cost of gravel & its primary packing and packing during development. lowering of housing & strainer assembly pipes, with supply and wrappiing of coir rope, wherever necessary, for arresting fine sand particles. The work will not include cost of housing pipe and strainer pipe assembly and development work, but work would be completed after obtaining sand free water.) 150 mm Nominal Bore.
(119) Drinking of water Facility at GUPS Sanskrit Seengla
PWD Integrated Building BSR 2022 Part "A" Part 1- Tube Well Construction to tube well from ground levels and upto 100 meter depth and above to accommodate housing and assembly pipe of following sizes in all types of alluvium strata by percussion/ rotary drilling method and with gravel as per IS : 4097-1967 and packing as per IS : 2800 ( Part I & II ) 1979 as amended upto date ( the work includes the cost of gravel & its primary packing and packing during development. lowering of housing & strainer assembly pipes, with supply and wrappiing of coir rope, wherever necessary, for arresting fine sand particles. The work will not include cost of housing pipe and strainer pipe assembly and development work, but work would be completed after obtaining sand free water.) 150 mm Nominal Bore.
NER-LJN Division;- Balrampur: Provision of cover shed for 06 wagon capacity (50x10m) Sqm & 02 nos. labour shed (03x05)Sqm.
D-NS Items (Tubewell work)
Const of tubwell Bauri para At Dhansa Under Mongaldihi G.P code-114655286
Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. (a) For depth upto 150 metre. (ii) 80 mm dia. boring etc.