Loading…
Loading…
2,217 results • Best match
Providing, Installation And Commissioning Of Solar Single Phase Motor pumpset At near Babulal Bhat House, Village Ramtalai Gram Panchayat Mandliya Block Ladpura District Kota.
Maintenance of tubewells which includes complete repairs / rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters, meters etc. of Solar Panel, electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of Histroy sheet as directed by Engineer-in-charge for tubewell per month. 0.5 HP to 5.0 HP
Providing, Installation And Commissioning Of Solar Single Phase Motor pumpset At near Hat Bajar Village Doliya Gram Panchayat Doliya Block Ladpura District Kota.
Maintenance of tubewells which includes complete repairs / rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters, meters etc. of Solar Panel, electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of Histroy sheet as directed by Engineer-in-charge for tubewell per month. 0.5 HP to 5.0 HP
Construction of Buildingless Sub-Health Centre at BAKARIGAON SC in Sonitpur District under PM-ABHIM for FY 2021-22 under NHM on Turn Key Basis
Installation of Deep Tube Well
Construction of Buildingless SubHealth Centres at various places of Assam under PM-ABHIM for FY 2022-23 48 nos. of Buildingless Sub-Health Centres At Khandokhuwa SC in Lakhimpur District
Installation of Deep Tube Well
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2022-23 48 nos. of Buildingless Sub-Health Centres At Phukanorhat SC in Lakhimpur District
Installation of Deep Tube Well
Maintenance, cleaning and de-silting of rain water harvesting structures and associated drains under the jurisdiction of Sports Division -1.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of useable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, including disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.