Loading…
Loading…
2,204 results • Best match
Construction of 200mm dia Production Well by ODEX Method at Kasnard Pannard Sangnard Well No. 2 District Anantnag.
Development of tube well in accordance with IS: 2800 (part-I) and IS: 11189 to establish maximum rate of uasble water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by V -notch method or any other approved method, measuring static level and draw down etc. by step draw down method, collecting water samples and getting tested in approved laboratory, i/c disinfection of tube well, all complete including required hire and labour charges of air compressor, tools and accessories etc. all as per direction of Engineer in-charge.
WARD NO-33 ME EKSARI ME 5 HP BOARING HDPE PIPE BICHANE KA NIRMAN KARYA
25 24.12 Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully develo ped, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete,including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. 6 PER HOUR 916.80 5501.00
Maintenance cleaning and de silting of rain water harvesting structures and associated pipe and drain network at Sports Complexes under the jurisdiction of Sports Division 2
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of useable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully eveloped,measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, including disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
Installation and shifting of pump sets and other repair and maintenance civil work at various Sump well/Tanks in PTPS Colony, Panipat
Providing GI pipes class B marked with IS: 1239 in 3.05 m length, their threading and welding with flanges (Heavy Duty) on both sides, jointing with nuts and bolts ( ‘W’ make), rubber gaskets , lowering into Tube wells and testing including carriage, loading, unloading etc. complete in all respects to the satisfaction of Engineer-in- Charge. 200 mm i/d (NS)
Construction of 125mm dia bore well by Drilling and installation of india mark II handpump set with plateform in Rural area of MLA Constituency Bundi, Distt. Bundi.
Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe.
Boring/Drilling of Bore well of 200 mm dia (By DTH Rig - ODEX Casing Pipe Method) and Supply, Installation, Testing and Commissioning of Submersible Pump with all electrical works and accessories at GCET Chak Bhalwal Jammu
Development to tube well in accordance with IS: 2800(part 1) and IS:11189 to establish maximum rate of usable water yield without sand content ( beyond permissible limit) with required capacity air compressor, running the compressor for required time till well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples & getting tested in approved laboratory, i/c disinfection of tube well, all complete including required hire & labour charges of air compressor tools & accessories, etc. all, as per direction of Engineer-in-charge.