Loading…
Loading…
2,195 results • Best match
Construction of Boundary Wall, Road, Drain, Rain Water Harvesting, Toilet and Guard Room of Gangajal Campus R-17, Sector- 12A, Greater Noida.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. DSR-18/23.12/SOR
Carrying out Zone works for period ending 30.06.2027 on Zone No. 3 LC.No. 244B to BPR (Both ex.) Loco Colony, station colony, S.E./works/ P. way,Sig, ADEN /L.office/ IZN, SMG Line, stn. colony, CBJ Line plant & colony / IZN.
Development of Tube Well by OP unit of 3 cusec Hour capacity and testing of tube well for yield.
Construction of Control Room Building and Other Civil Works for New 33/11 K.V. Sub-Station Dadri Town Distt- Gautambuddha Nagar
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. (DSR. 23.12 (Civil)
Providing Rain Water Harvesting in BBMP Buildings at Yeshwanthapura Constituency Phase-III
Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direct...
Providing Rain Water Harvesting in All Parks at Yeshwanthapura Constituency Phase-II
Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direct...
CONSTRUCTION OF 33 KV S/S BUILDING WITH B/WALL AT DISNAU, SIKAR
Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden, to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes, but excluding cost of casing pipes as per IS:2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe :150 mm dia Nominal bore.