Loading…
Loading…
2,174 results • Best match
Proposed Judicial Qtr. Grade II (G Plus 2) for SDJM Court Complex, Titabar, Dist. Jorhat
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable... with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down ...
TK-RDG New BG line project: Proposed construction of staff quarters between Tumukur- Rayadurga stations, Construction of SSE/P.way office, SSE/Works office, SSE/ S & T office, SSE/Electrical office, officer's Rest House and Supervisor Rest House and Area manager office at Pavagada station including approach roads and other associated work.(Composite Work).
Drilling borewell 150mm dia clear using fast rig in all strata of formation encountered to a depth as directed by Engineer (1) for first 30M
Operation and Maintenance of CPWS Scheme to Gullapadu, Malleswaram & Sivapuram habitations in Chintalapudi Mandal for the Year 2026-27, Est Cost Rs.9.00 Lakhs
... 5 to 25 MLD, 25 to 50 MLD , 50 to 100 MLD and Sources having large dia High yielding tube wells (Annexure is enclosed for the System staff.) (Population x LPCD X 243/1000) from 01.06.2026 ...
Operation and Maintenance of CPWS Scheme to Maheswarapuram and 5 other Habitations of Eluru Mandal for the Year 2026-27, Est Cost Rs.22.00 Lakhs.
... 5 to 25 MLD, 25 to 50 MLD , 50 to 100 MLD and Sources having large dia High yielding tube wells (Annexure is enclosed for the System staff.) (Population x LPCD X 365/1000) from 01.06.2026 ...
REPAIR/REPLACEMENT AND PREVENTIVE MAINTENANCE OF EXTERNAL WATER SUPPLY DISTRIBUTION AT PERIMETER AND ALLIED WORKS AT MIL STN DAPPAR UNDER AGE(I) DAPPAR
Dismantling and taking up submersible pumps set of any capacity and any size from bore well with the help of chain pulley block including dismaintling the MS/GI column pipe up to... defective / worn out parts and back to site, lowering the submercible pump set in to borewell after testing including connecting coulmn pipe and cable connection etc, after completion ...
Construction of infiltration well (2 nos) and providing submersible pumpset, starter, pumping main and cable at Cauvery river Parisal thurai headworks in Kulithalai municipality
Drilling of borewells of size 4” to 5” dia. in sedimentary formation using hand boresets including insertion of casing pipes and removal of casing pipes etc., including collection of samples as directed by the Department Officers.