Loading…
Loading…
2,019 results • Best match
Construction of Tube Well and Pump House SITC of pumping plant and other appurtenant Works under STATE SECTOR Programme at Jamalpur Kalan water supply scheme in Block Bahadrabad District Haridwar
Supply & shrouding of pea gravel in between bore & tube well assembly to the entire depth of tube well.
Sinking of a deep tube well 100mm dia with top enlargement 200mm dia upto 120mtr. depth by rig boring system within Hare Street Police Station located at 42, C.R. Avenue, Kolkata-700012, during the year 2026-2027
Labour for boring through any type of soil for sinking tube well of required dia. with top enlargement by rig boring system (either by reserve circulation or by direct rotary method) including hire charges and labour for rig machine, tools and plants, staging, force pumping set and making arrangement for water required for boring etc. complete and lowering of pipes, strainers, blind pipes etc. complete. (a) For depth upto 250 metre for 100 mm dia. Tube well with top enlargement of 200 mm dia.(upto 50 metre) (i) First 50 metre (1 X 50.000 = 50.000 m)
SIC of newly bored tube wells at C Block Kirti Nagar M Block Kirti Nagar L Block Kirti Nagar N Block Kirti Nagar in AC 25 re invite
Installation of a 2-horsepower mini-tube well at the Primary School, Khoda, under the Nagar Palika Parishad (Municipal Council) Khoda-Makanpur.
WORK FOR CONSTRUCTION, COMMISSIONING OF TUBE WELL, SUPPLY AND INSTALLATION OF SUBMERSIBLE PUMPSET AND REPLACEMENT OF DAMAGED AND WORN PIPELINE OF RWSS SCHEME KANERA TEHSIL NIMBAHERA
Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.
WORK FOR CONSTRUCTION, COMMISSIONING OF TUBE WELL, SUPPLY AND INSTALLATION OF SUBMERSIBLE PUMPSET AND REPLACEMENT OF DAMAGED AND WORN PIPELINE OF JJY SCHEME JALIYA TEHSIL NIMBAHERA
Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.