Loading…
Loading…
2,123 results • Best match
S/I/T/C of Solar Street Light and S/I/T/C of 2.0 KW Capacity Rooftof Solar Plant, Construction of Tube Well and S/F of 1.0 HP capacity Submersible Pump Set at at Hatpath Zorawarganj Mandi Samiti Purwa Unnao.
Drilling of 150 mm dia T/W bore suitable for 110mm dia pipe/200mm dia T/W bore suitable for 140 mm dia pipe all complete with labour T/P as per direction of engineer incharge
S/I/T/C of Solar Street Light and S/I/T/C of 2.0 KW Capacity Rooftof Solar Plant, Construction of Tube Well and S/F of 1.0 HP capacity Submersible Pump Set at at Hatpath Mamrejpur Mandi Samiti Purwa Unnao
Drilling of 150 mm dia T/W bore suitable for 110mm dia pipe/200mm dia T/W bore suitable for 140 mm dia pipe all complete with labour T/P as per direction of engineer incharge
S/I/T/C of Solar Street Light and S/I/T/C of 2.0 KW Capacity Rooftof Solar Plant, Construction of Tube Well and S/F of 1.0 HP capacity Submersible Pump Set at at Hatpath Bhadeswa Mandi Samiti Banthara Lucknow.
Drilling of 150 mm dia T/W bore suitable for 110mm dia pipe/200mm dia T/W bore suitable for 140 mm dia pipe all complete with labour T/P as per direction of engineer incharge
S/I/T/C of Solar Street Light and S/I/T/C of 2.0 KW Capacity Rooftof Solar Plant, Construction of Tube Well and S/F of 1.0 HP capacity Submersible Pump Set at at Hatpath Bahuda Kalan Mandi Samiti Bachrawan Raebareli
Drilling of 150 mm dia T/W bore suitable for 110mm dia pipe/200mm dia T/W bore suitable for 140 mm dia pipe all complete with labour T/P as per direction of engineer incharge
Purchasing and Repairs of Power Bores and Pumpsets Kompally and Dhulapally area in Kompally Municipality under General funds 2025-26. (Presently Circle 56,Kompally,QBZ,CMC)
Construction of 2 No. of Tubewell at Industrial area Chirawa
Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe., Add 15% extra on above item (Item No 2.4.1 to 2.4.2) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr., Nominal bore 200 mm dia.