Loading…
Loading…
24,443 results • Best match
SINKING OF DEEP TUBE WELL NEAR THE H/O BAPI SARDAR, JL NO-11, MOUZA-CHANDIPUR
Sinking of Deep Tube well near the h/o Bapi Sardar, JL No-11, Mouza-Chandipur
Construction of Gravel Packed Production Tube Well at GC Srinagar at CRPF Campus Humhama Srianagar
Development of tube well in accordance with IS: 2800 (Part I) and IS: 11189 to establish maximum rate of usable... with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by V-Notch method or any other approved method, measuring static level and draw down ...
NIT 91 ARC for Work of Repair and preventive maintenance of submersible pump sets and panels in existing tube wells Under jurisdiction of JEN Rural Virat Nagar PHED Sub Division Virat Nagar
... material components required to repair pumpsets, starters, meters etc. of electric panel of tube wells lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & history sheet as directed by Engineer-in-charge for tubewell per month 8.0 HP to 10.0 HP
Deployment of staff for E and M installation at various tube wells in Ram Nagar area ward No-80 in AC-22 Ballimaran Constituency
Deployment of staff for E&M installation at various tube wells under Ram Nagar area ward no 80 in AC-22 Ballimaran Constituency. The one person looking after the minimum 05 Nos of tube wells total No of staff deployed 20 Nos. ( unskilled worker 20 Nos ) Period 120 Days.
Re-location of Defunct Tube well in 2026-27 of 125/115 mm dia with 90.0 deep drilled tube well with installation of India mark II under D.W. and S. Division No-2, Dhanbad. (GR- DHN-2/SR-3 90mtr)
A : DRILLING PORTION Construction for 115/125 mm dia drilled Tube-Well for drilling in all kinds of soil rock for installation of hand pump with D.T.H Rig machine all complete... with D.T.H Rig machine all complete including supplying all materials, labours, tools, drilling, rigs, air compressor and equipments as well as fuel lubricant for making no. 125/115 mm dia boring etc and cost of transporting rig ...
Re-location of Defunct Tube well in 2026-27 of 125/115 mm dia with 90.0 deep drilled tube well with installation of India mark II under D.W. and S. Division No-2, Dhanbad. (GR- DHN-2/SR-4 90mtr)
A : DRILLING PORTION Construction for 115/125 mm dia drilled Tube-Well for drilling in all kinds of soil rock for installation of hand pump with D.T.H Rig machine all complete... with D.T.H Rig machine all complete including supplying all materials, labours, tools, drilling, rigs, air compressor and equipments as well as fuel lubricant for making no. 125/115 mm dia boring etc and cost of transporting rig ...