Construction of RCC Road, Yard Metal Spreading, P/F Razor coil on existing CW, Colour Work of Control Room & Compound Wall and misc. civil works at 66 KV Kukarwada S/S under Bharuch AM Division under Bharuch Circle.
Compound Wall and misc. civil works at 66 KV Kukarwada S/S under Bharuch AM
Augmentation of Boundary wall, Pump House, Blower Room and Construction Pathway and Approch Road at Head Work Site of MAHESHPUR Water Supply Scheme of Englishbazar Block under Malda Division, P.H.E.Dte. in the District of Malda. (3rd Call)
Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work).
This estimate covers the cost of Re-Construction of boundary wall and other allied Civil works to prevent the 33 kV S/Stn. Raipur Dhani (Fatehabad) form flood water due to it is situated in low lying and flood prone area. It also includes the cost of
DNIT for the work :- Re-Construction of boundary wall and other allied Civil works to prevent the 33 kV S/Stn. Raipur Dhani (Fatehabad) form flood water
Construction of retaining wall
Providing and laying cement concrete work 1:1.5:3 (1cement: 1.5sand: 3 greaded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in Walls including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Construction of retaining wall in connection with upgradation of 66kv sc to 110kV DC from Elachola to Malappuram
DEN/West/SBC Sec : KSR Bengaluru : Proposed construction of boundary wall in and around SBC area for a length of 1500 mtr.(2m height RR masonry and 1m fencing, Total 3m height) Maintenance period is 12 months