Loading…
Loading…
6,213 results • Best match
Ward NO. 07 Indravati Nadi ke paas Retaining Wall Nirman Karya.
Construction Of RETAINING WALL AT W-7 INDRAVATI NADI KE PASS
CONSTRUCTION OF RETAINING WALL FOR TALUK STADIUM OF NARAGUND TOWN
CONSTRUCTION OF RETAINING WALL FOR TALUK STADIUM OF NARAGUND TOWN
Construction of Retaining Wall Paver Block and Railling Construction at Ward No.30
Construction of Retaining Wall Paver Block & Railling Construction at Ward No.30
As per NIT Document
Average annual financial turnover on construction works should be atleast 30% of the cost put to bid during immediate last 3 consecutive financial years ending 31.03.2025.
Construct a new Boundary wall in the garden near the Gurudwara situated in Sudama Nagar under Zone no. 15 Ward no. 83.
Construct a new Boundary wall in the garden near the Gurudwara situated in Sudama Nagar under Zone no. 15 Ward no. 83.
Reconstruction of damaged compound wall towards HAFED at TE Compound, Ganaur
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)