Earthwork in formation and in cutting, Blanketing, Construction of Minor Bridges, Major Bridges, Drain, Retaining Wall, Toe Wall, Track Works, Station Building, Level Crossing Works, Passenger Amenities Works, Signalling & Telecom works, Electrical works in connection with execution of 3rd Line between Barabanki to Burhwal section, on EPC mode, under Lucknow Division of North Eastern Railway.
Centering and shuttering including strutting, propping Sqm etc. and removal of form for : All types of bridge sub- structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level. [USSOR-2021, item no.025030+025031]
Augmentation of Boundary wall of Head Work Site of Deotala Pipe Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the district of Malda. (2nd Call)
Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work). a) With earth obtained from excavation of fundation.
Construction of Retaining wall Drain and Regrading of the approach roads in Nazeerabad village from km 74.8 to km 75.2 on Manneguda Ravulapally section of NH 163 in the State of Telangana under Annual Plan 2026 2027v
PROVISION OF STORE AT CERTAIN PLACES CHANGING ROOM IN AIRMEN CLOTHING STORE IN LOGISTICS SECTION CONNECTING PATHWAY AT MES INSTALLATION BOUNDARY WALL AT PARADE GROUND AT ETI OF AFS JALAHALLI AND AFTC
M & L for preparation of new plastered surfaces of walls applying one coat of wall care putty 1mm thick and then applying two coats of premium oil bound distemper over one coat of primer as per manufacturer instructions of required shade complete all as specified and directed.
Construction of PF, FOB, PF shed, retaining wall, station buildings, drainage including development of station circulating area and other ancillary works from Madanpur Station (including) to Payradanga Station (including) in connection with ... with construction of ...
Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material 03 and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. All kinds of soils
Additional work for creating seaparate zone with sinking of 300 x 200 mm dia ,5.4 x 3.6 mt pump house, boundary wall at Gopalpur (Kankardanga, Charipara, Dhoyadanga, Susung doba) village under Augmentation of Gopalpur water supply scheme of RCFA Divi
Additional work for creating seaparate zone with sinking of 300x200 mm dia ,5.4x3.6 mt pump house, boundary wall at Gopalpur (Kankardanga, Charipara, Dhoyadanga, Susung doba) village under Augmentation of Gopalpur water supply scheme of RCFA Division-I PHE Dte. (Including 18% GST & 1% Cess)