Loading…
Loading…
5,955 results • Best match
Upgradation of existing HSC with additional labour room, Parking shed, Yoga shed, Boundary wall, Entrance gate, Recharge pit, Sharp pit, P.C.C road approach to HSC, Paver Block pathway at Singhdih HSC, Block-Topchanchi, Dist-Dhanbad.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) 5.3.2.3
Pothole filling using 36 mm metal, BM, BC, Concrete works for drainage and Irish drain, and Traffic safety arrangement
Retaining wall
Upgradation of existing HSC with additional labour room, Parking shed, Yoga shed, Boundary wall, Entrance gate, Recharge pit, Sharp pit, P.C.C road approach to HSC, Paver Block pathway at Bardaha HSC, Blok-Baliapur, Dist-Dhanbad.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) (5.3.2.3)
Upgradation of existing HSC with additional labour room, Parking shed, Yoga shed, Boundary wall, Entrance gate, Recharge pit, Sharp pit, P.C.C road approach to HSC, Paver Block pathway at Palani HSC, Blok-Baliapur, Dist-Dhanbad.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) (5.3.2.3)
REPAIR MAINT OF DRAINS COVER SLABS STORM WATER SUNSET SHEDS DAMAGED CULVERTS RETAINING WALL AND ASSOCIATES MAINT NATURE WORKS AT OFFRS MD ACCN IN ZONE A AND OVERHAULING OF LIFT EOT CRANE MECHANICAL LAUNDRY SERVICING AND OTHER CONNECTED ITEMS UNDER GE
M&L applying two coats of acrylic exterior weather proof emulsion paint over a coat of exterior primer on newly plastered wall surfaces/ old decorated wall surfaces, in case of old decorated wall surfaces includes complete removal of existing wall finish of any type with wire brush, brooming, dusting & finally washing with water to clean the surface absolutely free from any kind of foreign materials and making good minor cracks etc complete all as specified and directed by Engr-in-Charge/GE.
Construction of office cum technology demonstration Centre of NECTAR at Shillong, Meghalaya (SH: Development, works such as Internal Road Site development, Retaining Wall, External water Supply, Storm water drain & drainage, STP, Street Light and other allied miscellaneous works) (Package-III).