Loading…
Loading…
6,078 results • Best match
Laying of CC Roads from jarnappa pan shop to bhavani mandir, maruthi ply wood shop to madarsa ghouri function hall, mohd wajeed hosue to mohd khurseed house, moiz house to rahmath ali house, mansoor ali house to compound wall in green park enclave, in Ward No.14 of Zaheerabad Municipality Sangareddy District.Under (Nagarabhivrudhi Funds)
P/L Interlocking tiles,sewer line and water supply line in remaining street of Pipal Wali Gali Kothi Wala Rah W No.3
Renovation of the Control Room Buildings at Receiving Stations Narbal, Khanda, and B.K. Pora, along with the construction of chain-link fencing at Receiving Stations Narbal and Beerwah and Compound walling of Receiving station Khanda
Compound walling of Receiving station Khanda
Planning, Design, Construction, Testing and commissioning, certification, validation of Biosafety Level-3 (BSL-3) Laboratory (G plus 1 floor) in EPC Mode-I under PM-ABHIM for National Centre for Disease Control (NCDC) at KIMS, Hubballi, Karnataka ... pre-fabricated wall panel ... structure, Retaining walls, ... Retaining walls , ...
Construction of Viaduct with pile foundation, RCC pier, RCC or PSC girder and reconstruction of RE Wall with the replacement of backfill and ground improvements in the remaining approaches of ROB at Km 28.200 in the Jabalpur to Hiran river section of
Construction of Viaduct with pile foundation, RCC pier, RCC/PSC girder and reconstruction of RE Wall with the replacement of backfill & ground improvements in the remaining approaches of ROB at Km 28+200 in the Jabalpur to Hiran river section of NH-45 on EPC mode
REPAIR TO SECURITY WALL AND SECURITY FENCING and CRUSH GATES IN TECHNICAL AREA AT AIR FORCE STATION PATHANKOT
M&L for RCC M-25 on Walls, retaining walls,basement walls, ballastwalls and the like; any thickness; above top of footings; including attached pilasters and buttresse complete all as specified and directed by Engr-in-Charge.