Loading…
Loading…
5,821 results • Best match
NPP Siswa ward no 16 Sardar Patel nagar Me shri budhiram ke ghar se shri Sonu gupta ke makan tak CC Road ewm Nali nirman kary.
Earth work exeavation for andinary soil for retaining wall foundation work both side Sl. No.251
NPP Siswa ward no 03 Subash nagar me shri Amerika ke makan se Mohan gupta ke khet tak CC Road ewm Nali nirman kary.
Earth work exeavation for andinary soil for retaining wall foundation work both side Sl. No.251
ROAD WIDENING WORK IN JECINTHA BOROMIA PETALS HOUSE IN WARD NO 48 KANKANADY VELENCIA(Category II (A)Reserved)
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coars...
Construction of drain from 5th cross right side of road behind MORE store in A-block to Rajakaluve in Gopalagowda layout, ward no.17 of SCC limits(Reserved for ST)
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coars...
River protection work near Khairi Bridge right hand side Pier CPS-1.
Centering and shuttering including strutting, propping Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Chandanpur- Shaktigarh 4th Line: Execution of Civil, P-Way, Electrification, Signal and Telecom Works for Construction of 4th Rail Line between Chandanpur Station (Incl.) and Pallahroad (Incl.) from Km 40.220 to Km 78.120 in connection with Chandanpur- Shaktigarh 4th Line Rail Project of Eastern Railway
Supplying & laying of drainage Sqm composite for use behind abutments, wing walls, return walls and Retaining walls Geocomposite drain (Vertical) as per RDSO Specification No. RDSO/2018/GE:IRS-0006 latest version with all material, labour, equipment, tools and plants, lead, lift etc. complete in all respects as per the direction of Engineer- in-Charge. Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.