Loading…
Loading…
6,039 results • Best match
CONSTRUCTION OF BOUNDARY WALL AT 3311 KV SS padtawal DIST mahrajganj
Supply and fixing of boundary wall with Precast Column and Pannel (with prestressed concrete , pannel size-2100x300x50mm and column size 150x150x2400mm ,1800 mm. above and 600mm. below ground level) including fixing of pannel & column in proper alignment including cost of all material labour and T&P etc. required for proper complection of work as per direction of engineer incharge . (C.C. for grouting, excavation of pit and P.C.C. shall be paid extra)
CONSTRUCTION OF BOUNDARY WALL AT 3311 KV SS khantara DIST siddharthnagar
Supply and fixing of boundary wall with Precast Column and Pannel (with prestressed concrete , pannel size-2100x300x50mm and column size 150x150x2400mm ,1800 mm. above and 600mm. below ground level) including fixing of pannel & column in proper alignment including cost of all material labour and T&P etc. required for proper complection of work as per direction of engineer incharge . (C.C. for grouting, excavation of pit and P.C.C. shall be paid extra)
1. Construction of a boundary wall at the Ra Pra Vi Krishnaram Meghwal ki dhani 2. Construction of a boundary wall at the angan wadi center Chandaniyo ka par gram panchayat padariya
Construction of Staff Quarter Incl. Boundary wall at GDC Kupwara
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with with water proofing cement compound @ 0.253kg/ sqm. This layer will be allowed to air cure for 4 hours. (b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm . This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours.The rate includes reparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.
Construction of Boundary Wall at 132kv Sub station Old Bawal.
CONSTRUCTION OF BOUNDARY WALL FROM WATER TREATMENT PLANT TO MRF