Loading…
Loading…
6,128 results • Best match
REPAIRS TO PRE FAB JAFRI WALL, SECURITY WALL, BOUNDARY WALL FENCING, BARBED WIRE, CHAIN LINK FENCING AND OTHER CONNECTED ITEMS FOR ZONE-I OF AGE B/R (WEST) UNDER GE (WEST) COLABA, MUMBAI
Supply & Fixing PVC coated chain link fencing wire gauge 4mm and wire thickness 4mm including line wires and mesh size type of stadards, rail straining bolts etc size of mess 50x 50 mm including dismantling of existing fencing, complete all as specified and directed.
Construction of property compound wall to 220kV station land at Netlamudnur-5th and final phase
Construction of property compound wall to 220kV station land at Netlamudnur-5th and final phase
Estimate for Construction of Boundary Wall For Child Cremation Sector-37 Sarai Ward no. 24 Faridabad(Recall)
Estimate for Construction of Boundary Wall For Child Cremation Sector-37 Sarai Ward no. 24 Faridabad
CONSTRUCTION OF BOUNDARY WALL AT BSAP DUMRAON IN THE DISTRICT OF BUXAR
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5 mm thick) wire of high tensile strength of 165 kg/ sq mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Construction of Boundary wall at proposed 33/11 KV, P/S/S, DGMS, Hirapur, Dhanbad
Construction of Boundary wall at proposed 33/11 KV, P/S/S, DGMS, Hirapur, Dhanbad.
Repair of Boundary Wall at Govt. SSD High School, Bhatrasiuni under Nabarangpur Block
Weathering two coat with any approved Weather coat on new work after scraping and cleaning the surface over one coat of water bound wall primer including watering and curring all cost of materials, scaffolding, labour with T&P etc. complete as per direction of Engineer-in-charge.