Construction of 33 KV Sub Station Building and Boundary Wall at Bhakrani
Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). (B-55/3.2.4)
Construction of 33 KV Sub Station Building and Boundary Wall at Bheemsar
Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). (B-55/3.2.4)
Construction of 33 KV Sub Station Building and Boundary Wall at Chodiya
Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). (B-55/3.2.4)
CONSTRUCTION OF BOUNDARY WALL AT 33/11 K.V. S/S-BAKTAWARGANJ, DISTT-MAU.
Construction of boundary wall with Precast Column and Pannel (with prestressed concrete , pannel size-2100x300x50mm and column size 150x150x2400mm ,1800 mm. above and 600mm. below ground level) including fixing of pannel & column in proper alignment including cost of all material labour and T&P etc. required for proper complection of work as per direction of engineer incharge . (C.C. for grouting, excavation of pit and P.C.C. shall be paid extra)
CONSTRUCTION OF BOUNDARY WALL AT 33/11 K.V. S/S ADARI, DISTT-MAU.
Construction of boundary wall with Precast Column and Pannel (with prestressed concrete , pannel size-2100x300x50mm and column size 150x150x2400mm ,1800 mm. above and 600mm. below ground level) including fixing of pannel & column in proper alignment including cost of all material labour and T&P etc. required for proper complection of work as per direction of engineer incharge . (C.C. for grouting, excavation of pit and P.C.C. shall be paid extra)
Construction of Boundary wall, Gate work and other civil work at 33/11 kv SS Pahadi, Chitrakoot
Construction of Boundary Wall,Gate work& other civil work At 33/11 KV SUB Station Pahadi Chitrakoot