Loading…
Loading…
5,989 results • Best match
Construction of 33 KV sub-station building and boundary wall at Rampura (Samdari).
Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). (B-55/3.2.4)
Construction of 33 KV sub-station building and boundary wall at Jethantari (Samdari).
Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). (B-55/3.2.4)
Construction of 33 KV Sub Station Building and Boundary Wall at Annapurna Mataji.
Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). (B-55/3.2.4)
RCC, Random Rubble Masonry, Solid Block Masonry, Plastering, Painting and Fencing
4.2.2 Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources
Construction of compound Wall, Drain, Vehicle Shed etc at ANMTC Paralakhemundi, Gajapati Buildings.
Providing and Painting the surface of the walls with one coat of wall primer(water based) of approved quality after cleaning the plastered surface perfectly by watering and brushing including cost , conveyance of all material, brushes, all labour, scaffolding, T&P etc. required to complete the work in all respect as per specification and direction of the engineer-in-charge. (Quantity-C.W.-720, Vehicle Shed-134.22)
CONSTRUCTION OF COMPOUND WALL AND REPAIRS TO THE GOVT. JR.COLLEGE AT BONAKAL IN KHAMMAM DISTRICT
COMPOUND WALL:- Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Manual Means.