Loading…
Loading…
34,685 results • Best match
Construction of Compound wall with lighting arrangements at Compost yard in Melur Municipality.
Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers.
Construction Of Compound Wall At Dyane Matang and Garudi Shamshan Bhumi At Malegaon
3.00 MRUNAL CONSTRUCTION (GSTN-NA) BID ID -7117127 315300.000 5.000 331065.000 Three Lakh Thirty One Thousand Sixty Five
Construction of Compound Wall at Koladi main road MCC in ward no.48
Construction of compound wall to at Gandhi road Burial Ground in Ward -08
Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers.
Construction of Compound Wall in Burial Ground (Muslim) at Karasangal in Kancheepuram District.
Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers.
COMPOUND WALL FOR AYURVEDHA DISPENSARY, PAINTING OF YOGA HALL AND CONSTRUCTION OF TOILET
13.111.1:Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface