Loading…
Loading…
4,225 results • Best match
Civil Foundation Works for the pit less Weigh bridge including operator cabin.
Part:A- Scheduled Items of Work
various bridges under Kollam Bridge Section 1- General Civil Work
OD16756/2026-2027:Engaging Man mazdoor for cutting bushes ,assisting wood cutter, removing grown up vegetation from the bridges and its premises, cleaning of joints, removing excess soil on the sides and drainage spouts, filling of pot holes using shelmac , helping etc as per the direction of department officers.
FDR 10 2025 SP BPRC Repairs to the single lane bridge at km 8 849 of BPR Canal
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from KM 41.50 to Km 69.60 (including Nunkhari Station) involving Earthwork in formation, Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor ... Minor Bridges , ... Major Bridge , ... Under Bridge (RUBs), ... Protection works , ... BLT works , ... Track works with ... Rails), construction of ...
Each Total 12324630.00 Schedule G1A-1 Execution of Major Bridges & viaducts Foundation work i.e. piles, pile caps, of Abutments and piers etc, not covered in Schedule -G {Note: Rate should be quoted (%
Ordinary Repair of Bridge Culvert and Road under Division Ramanujganj Distt Balrampur
Zonal contract (Bridge Works) under the jurisdiction of SSE(Bridge)/North & South of Khurda Road Division for the period upto 30/06/2027.
direction of Engineer-in-charge of the work. The work