Loading…
Loading…
4,339 results • Best match
Construction of H.L Bridge over Local Nallah on Jhandi to Singer Road under SBYin the Dist. of Sundargarh for the year 2025-26.
Providing & laying of wearing course of 56mm thick consisting of 6mm thick mastic asphalt and 50 mm thick asphaltic concrete on top of the Deck slab. The mastic asphalt shall be of paving grade bitumen meeting the requirement given in the table 500-39, prepared by using mastic cooker and laid to required level & slope after cleaning the surface, applying prime coat including providing antiskid surface with bitumen precoated fine grained hard stone chipping of all complete as per clause 501, 502,503 & 516 of MoRT&H Specification for road & bridge work (5th revision), followed by asphaltic concrete to be laid in two layers of 25mm thick each etc complete as per approved drawing & technical specification Clause No 503 & 507 of MoRT&H specifications for road & Bridge work (5th revision) and as per direction of the Engineer-in-charge.
HYB Division:- Annual Zonal contract for bridge works in HYB Division for the year 2026-27
Providing Pole Light work in Sirgitti Railway Over Bridge at Bilaspur (C.G.)
Relaying and repair of Interlocking tiles in Front of Main Talwara Road to Under Bridge Talwara
Relaying and repair of Interlocking tiles in Front of Main Talwara Road to Under Bridge Talwara
Preparation of DPR for Construction of new Dimdima Bridge 01(One) no of 3 Lanned Bridge parallel to existing Dimdima Bridge at ch 61.058 km of AH_48 (83.309 km of NH 17) under Construction Division, AH 48 Maynaguri.
Preparation of Detailed Project Report (DPR) for Construction of new Dimdima Bridge [01(One) no of 3-Lanned Bridge at the location parallel to existing Dimdima Bridge] at chainage 61.058 km of AH-48 (83.309 km of NH 17) under Construction Division, Special Project, Asian Highway-48 in the District of Jalpaiguri, West Bengal
CONSTRUCTION OF SUBMERSIBLE BRIDGE AT BORAMCHA (TIROL) OVER BANAS RIVER
Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305.