Loading…
Loading…
4,340 results • Best match
Construction of RCC Bridge no-1/1, Banugaon to Pakriguri over Saralbhanga River CE/EAP/ARRBP/OCB/Bridge-1/Kokrajhar/38
Providing and constructing temporary island for construction of well foundation complete as per technical specification.
CONSTRUCTION OF BRIDGE AT KM 0.17 ON GUNDINAPALYA-MADAVARA ROAD IN KORATAGERE TALUK
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Repair OF Bridge over Maila River at Panchayat Janho Block Manika Dist - Latehar (Length - 0.85 mtr)
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres
construction of pedestrian steel bridge at rd 7100 of juan disty
Civil Work
Repair to Damaged Bridge/CDS on Shahapur - Shivarampur Road (SH-149) at Ch. 189.83, 199.76, 200.26, 211.22 in Chincholi Taluka and Repair to Bridge on Wanmarpalli-Raichur Road (SH-15) at Ch 108.50 km in Chincholi Taluka Dist. Kalaburagi. Under 5054-80-190-0-01-132 for the year 2025-26
Bridge Repairs on SH-149
Flood Protection Work at Khanetar Nallah Kunaiyan Dungamang and D S Kalai Bridge
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil