Loading…
Loading…
4,628 results • Best match
Canal maintenance
Rigid and smooth centering, shuttering including all cost, conveyance, taxes, royalty dismantling after specified period and removing the debris after completion of works clear off the work site etc. complete as per the direction of the Engineer-in-charge.
construction of Bridge 1Con8th Mile stone Nanjuvalli Muttala MDR in Hosanagara Taluk at ch 3.30 km(Near Hiremaithi)
Construction of Bridge Over River Ishan in between village Birra Khanpur - Bilhaur - Makanpur Road in District Kanpur Nagar
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) (125 mm thk) (MORT&H -4.1 B)
Construction of Minor Bridge (2X5.0m Span) at Ponnarkulam near Bus stop in Erukkandurai Village Panchayat, Valliyoor Panchayat Union.
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Construction of Minor Bridge (2X5.0m Span) at Sankaneri near Surplus weir in Erukkandurai Village Panchayat, Valliyoor Panchayat Union.
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
(1) Replacement of Existing Steel Girder bridge with PSC slab 2x12.2m) (Bridge No. 59 Km 329/13-14 (UP & DN) between Chhapra Kacheri-Bhatni Section, Bridge No. 19 (SL) Km 362/05-06 between Kaptanganj-Gorakhpur Cantt Section. (2) Restoration work of ... of Bridge No. ... Retainer, bridge tablet ... Minor Bridge in ... of Bridge No. ... on Bridge No. ...
6.00 1000mm with back support frame welded to vertical post of MS angle of size 50mmx50mmx6mm of 3950 mm long Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.