Loading…
Loading…
4,694 results • Best match
Construction of link road to Tar village from New bridge (by way of WMM, BT and OGPC in Km3rd, 4th and 5th). Under SDP
Strengthening of Mofada Khedi Ahir Bamhangaon road, total length 4.80 Km. (Proposed length 1.81 Km.) under P.W.D. Sub Dn. Seoni Malwa. 1st Call, PAC Rs. 121.44 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 day
Strengthening of Mofada Khedi Ahir Bamhangaon road, total length 4.80 Km. (Proposed length 1.81 Km.) under P.W.D. Sub Dn. Seoni Malwa. 1st Call, PAC Rs. 121.44 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Repairs and maintenance to Culverts Head Walls on Jungamawadi (Karnataka Maharashtra state border) to Shankarawadi (Karnataka Maharashtra state border) SH-179 at KM No 23.45 and KM No 27.70 in Chikodi Tq of Belagavi Dist under H/A 3054 SH BRIDGE MAINTENANCE.
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Bridge rehabilitation work at 3.85 km (near Hemmaragal) of the Basavattige-Hemmaragal-Kebbepura road connecting Badanavallu (National Highway 150A) of State Highway 301 to Veeranapura Gate (State Highway 81)
Bridge rehabilitation work at 3.85 km (near Hemmaragal) of the Basavattige-Hemmaragal-Kebbepura road connecting Badanavallu (National Highway 150A) of State Highway 301 to Veeranapura Gate (State Highway 81)
Construction of a checkdam cum bridge across the halla connecting Bandikoppalu, Rajanashiriyuru and Karikattehalli villages in Halebeedu Hobli coming under Belur Vidhanasabha Constituency, Hassan District
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
Prajabar Arankiarana Road, from 1.80 km to 2.10 km, 3.80 km to 4.10 km, 6.169 km to 6.200 km, 6.800 km to 6.993 km, 8.611 km to 9.500 km and Moyna Bridge Approach Road, from 0.00 km to 0.695 km, patch repairing work by precoating materials, brick sti
Water Bound Macadam Sub Base by consolidating Jhama metal of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base consolidating using Jhama metal (63 mm to 45 mm)@ 1.09 Cum loose volume./Cum of compacted volume. with moorum screening @ 0.26 Cum loose volume./Cum of compacted volume.