Loading…
Loading…
4,696 results • Best match
Estimate for Remodeling/Re-construction of V.R. Bridge At RD 25515 of Minor no. 2 and raising of VRB 18870 of Minor 2 of BARNALA DISTY
Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , as per dimensions in the PWD stanadard drawing No 27.Section 4,Including form work but excluding steel reinforcement-and at locations directed by the Engineer, all as specified-with concrete mixure.
Construction of diversion (length 685m) due to damaged H.L. Bridge (9x25m) over Batane River in Km. 141.00 of NH-139 for the year 2026-27.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (I) B(i) Mechanical Means( Depth upto 3 m )
SH C/O Sub-Structure Super Structure and both side bridge approaches under NABARD-RIDF-XXXI.
Earth work in excavation of foundation for structures for bridge in all depths as per drawing and MoRTH technical specification section 300 and clause 304 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiselling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines, grades, side slopes, width, camber super elevation and levels as shown on the drawings or as directed by the Engineer-in-Charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner filling of unevenness blind age and finishing of the road to specified dimension or as directed by the Engineer-in-Charge. The rate is including Octroi, Royality, Malkana, Toll Tax or any other Taxes imposed by the Government but excluding GST.
MW:- Reconstruction of minor bridge at Km 7/6-8 of Nandivargam - S.Kothur to meet PBG road in Nandyal District SW:- Conducting investigation sub-soil exploration soil testing for the work of Reconstruction of minor bridge at Km 7/6-8 of Nandivargam - S.Kothur to meet PBG road in Nandyal District
Construction of Road bridge including approaches at Km 3.50 near Ramadevara Temple & Improvements to Canal in between km 3.00 to 4.00 under Distributary No.14 of RBHLC
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates complete as per directions of engineer in charge of work.
Providing and Fixing Paver Block, Tiranga Grill and Other Beautification Work Parallel to Kolar Six Lane from Bhoj University to Sarvdharm Bridge, Ward No. 80, Zone No. 18
Providing and Fixing Paver Block, Tiranga Grill and Other Beautification Work Parallel to Kolar Six Lane from Bhoj University to Sarvdharm Bridge, Ward No. 80, Zone No. 18