Loading…
Loading…
21,096 results • Best match
Towards Supply, Delivery Laying and JOinting of HDPE Pipe Line work at: Fire Station to Saidabad Y Junction, underneath the Steel Bridge Circle-27, Malakpet, Charminar ZOne, GHMC for the year 2025-26
Repair Rehabilitation of existing Hanskhali Bridge with slope protection of abutment situated over River Churni at Ch 15.50 Km on the Hanskhali-Bagula-Duttaphulia Road of Quality Control Sub-Division No I under Nadia Highway Division No II PWRoadsDte
Rerouting of existing of 400mm dia Coramandal bulk water supply pipe line with MS Carrier pipes and 800mm dia Casing Pipe (Thatipudi source) at Railway crossing Portion through Horizontal Direction Drilling Technique Method near railway Bridge ... Contribution Work
Construction of High level bridge at km 0/2 of road branching from km 96/10 of Salem Tirupathur road to Dhanduganoor H.C road in lieu of existing causeway
Construction of SPT Bridge No.1/1 over river Kollong at Gumutha Gaon Road under SOPD-G for the year 2025-26 under Kaliabor and Samaguri Territorial Road Division.
BTR_RIDF_XXXI_25_26_17 Construction of RCC Bridge No.1/1 over river Dhola on No.1 Bishnupur Bazar to Daoraibari road under RIDF-XXXI of NABARD for the year 2025-26.