Loading…
Loading…
21,614 results • Best match
(i) construction of high level bridge over terapatia river at ch 255 km (ii) kalidhwa river at ch 11.700th km (iii) bhalki nala at ch 10.987th (iv) sagaria river at ch 5.494th km in Kharoni to Durgapur Rd under road div dumka for the year 2024-25
Construction of CD, Bridge, VCW, in Km 4/2, 4/4 (a), 4/4(b), 7/6, 10/4(a), 10/4(b), 26/2, 26/8, 27/2 on Ashoknagar Vidisha Road to Bhadon Rajpur Chhipon Road under PWD Sub Division Ashoknagar Division Ashoknagar (MP)
STBR/SOPD-G/Rangapara-05/65 Construction of road from i)Harcchura 13 no line to Dabar Connecting road ii)Drain at Hatidubi Tiniali to Bridge no 1/1 Under Mukhya Mantrir Nagariya Pakipath Nirman Achani (MMNPPNA) under SOPD-G for the year 2025-26, Ran
Geotechnical Investigation for the work, Construction of RCC Bridges of at Sundarpur over Baksi Khal in G.P11 2 No Radhamohanpur2 5 No Haur, Block PS Debra Panskura 1, Dist.Paschim Medinipur Purba Medinipur.
Cleaning minor repairing and painting work of Bridges at Chainage 32.5 Km, 36.30 Km, 37.50 Km, and 43.40 Km of Howrah Amta Road under Howrah Division, P.W.D. during the year 2025-26.
Repair of RCC Railing Carrying out repair of RCC M30 railing to bring it to the original shape.
Emergent repairing of Potholes of Kharubaj to Khochabari Bridge road from 1.50 kmp to 3.40 km and Kismat Dasgram VR from 1.50 kmp to 4.50 km under P.W.D. Dinhata Sub-Division, under P.W.D. Cooch Behar Division, during the year 2025-26
... means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H 5th Revision). For WBM / WMM Surface: (with primer @ 0.85 kg/sqm). Using MS ...