Loading…
Loading…
21,614 results • Best match
Construction of Bridges under Pradhan Mantri Gram Sadak including maintenance for Five Year after construction.
Road/Bridge Work
Construction and Maintenance of Road and Bridges
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared... appropriate weigh bacher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates ...
MISC. REPAIRING OF WEIGH BRIDGE AND CALIBRATION OF 60MT AND 40MT WEIGH BRIDGE OF DOCP, CV AREA.
eProcurement System of Coal India Limited Created By: ASHOK KUMAR BHUNIA Created Date/Time: 27-Nov-2025 05:31 PM Tender Title: MISC. REPAIRING OF WEIGH BRIDGE AND CALIBRATION OF 60MT AND 40MT WEIGH BRIDGE OF DOCP, CV AREA. Tender ID: 2025_BCCL_346713_1
Construction and Maintenance of Road and Bridges
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared... appropriate weigh bacher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates ...
Katgora Kasachora Bridge Bar Repairing
Katgora Kasachora Bridge Bar Repairing
REPAIRING OF MOGRA BRIDGE AT SEJA