Loading…
Loading…
15,975 results • Best match
Repair to Bridge over local Nallah on Brahmanapada to Baradakhole road such as Bridge approch for the year 2025-26
Earthwork in excavation of foundation in hard soil within the initial lead and lift includimg rough dressing and breaking clods with cost and conveyance of all materials royalty and taxes of all materials cost of labour T&P required for the work etc.complete as per the direction of the Engineer-in-Charge
GENERAL-Destination Challenge at Chathamangalam GP-From Koolimad Bridge to Chettikadavu Bridge-General Civil Work
3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
SOPD_G_25_26_18 Construction of road from Harmoti Garh Bridge to NH-37(length, L-300.0M) with protection works under SOPD -G for the Year 2025-26.
Canal Bridge at 0.549 Km and 1.650 Km of Narayanpur - Silda Link Road, Repair and Rehabilitation Work, Under Jhargram Highway Division in the district of Jhargra.
Repairing work on the bridge located on the Middle Ganga Canal on the Kathikheda Road at chainage 5-900 of the Bachhlauta Bridge to Ghunghrala Brijnathpur Sugar Mill to Parpa Road -ODR- in District Hapur
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Including cost of, all material, labour, T&P, royality, all taxes and labour cess complete. required for proper completion of work. DSR 2023.15.3. But excluding GST.
Repairing work on the bridge located on the Middle Ganga Canal on the Lalpur road at chainage 4-000 of the Bachhlauta Bridge to Ghunghrala Brijnathpur Sugar Mill to Parpa Road -ODR- in District Hapur
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Including cost of, all material, labour, T&P, royality, all taxes and labour cess complete. required for proper completion of work. DSR 2023.15.3. But excluding GST.