Loading…
Loading…
15,964 results • Best match
STRENGTHENING WORKS OF SAUNTIYA PARWARIYA ROAD LENGTH 7.50 KM. PAC 565.57 lacs First Call on Road and Bridge SOR 11-04-25 work period 365 days I/c rainy season
Construction of RCC Bridge No- 1/1, RCC Bridge over Tarang River at Bwigriguri village CE/EAP/ARRBP/OCB/Bridge-1/Kokrajhar/26
Providing and constructing temporary island for construction of pile foundation with depth of water upto 4.0m complete as per technical specification.
Construction of bridge over Jeera river at 1.10Km on Kulsira-Urduna RD Road to Sirapali Road
Earthwork in excavation for bridge works in all kinds of soil, by mechanical means utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge.
Rehabilitation and Repairing work of Minor Bridge at Ch. 6/100 on SH-09 Varvand Kadethan Hatvalan road MDR-97 Taluka Daund District Pune.
Rehabilitation and Repairing work of Minor Bridge at Ch. 6/100 on SH-09 Varvand Kadethan Hatvalan road MDR-97 Taluka Daund District Pune.
CONSTRUCTION OF BOX BRIDGE NEAR DHADUKCHATI SITARAM MAITY HOUSE 109845408
CONSTRUCTION OF BOX BRIDGE NEAR DHADUKCHATI SITARAM MAITY HOUSE 109845408
CAPEX Bridge Works