Loading…
Loading…
15,940 results • Best match
Construction of FPE Ong left from Ong bridge to Sansamura from RD 00m to 1200m.(Working RD from 00m to 510m.)
Earth work in filling of any approved type of soil from approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 1 Km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering earth work upto OMC condition and compaction with PRR in embankment for all heights including construction, maintenance, watering and lighting of haul road and borrow area and hire & running charge of all machinaries,royality,cess etc. complete as per the direction of Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.)
Repair to Bridge over Safei Nallah on Gopapur to Odamburu road for the year 2025-26
Repair to Kushabhadra Bridge with approach on Nachhipur Kulialum Sandei Road for the year 2025-26.
IRON FENCING
eProcurement System Government of Uttar Pradesh Created By: JANARDAN SINGH YADAV Created Date/Time: 03-Jun-2026 04:42 PM Tender Title: CHUNAR IN GANGA RIVER ON BRIDGE FOR IRON FENCING WORK Tender ID: 2026_CEMRZ_1143996_1
SHIFTING OF HT LINE OVER BRIDGE CONSTRUCTION SITE AT KUTURAKEN VILLAGE UNDER RWES BOLANGIR
eProcurement System Government of Odisha Created By: Jitendra Kumar Sahoo Created Date/Time: 16-Aug-2024 11:48 AM Tender Title: SHIFTING OF HT LINE OVER BRIDGE CONSTRUCTION SITE AT KUTURAKEN VILLAGE UNDER RWES BOLANGIR Tender ID: 2024_CERWI_104086_1
Bridge Maintenance and Protection Work 3x 28 m Major Bridge At Kalyani River In Kali Mitti-Fatehpur Chaurasi-Dabouli-Shivrajpur ODR km-5
Mild Steel or Iron work of smaal sizes and sections such as holding down bolts ,hold fast tie rods gratings etc (When not included in an over all rates )wrought to required form , including supply of steel , bolts , nut and wastage etc and their fixing requirf for proper completion of work.(As per SOR Chapter-10 sch pwd-502