Loading…
Loading…
19,935 results • Best match
Construction of Bridge cum Barrage across Halla near Rankalkoppa-Doddamangadi villages in Ramdurga Taluka, Dist-Belagavi (SCP/2025-26)
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine ...
Annual Plan-THRISSUR CORPORATION EAST ZONE- DIVISION 3 PERINGAVU FRIENDS LINE-PERINGAVU BRIDGE THODU CLEANING-Division 3-General Civil Work
OD497569/2025-2026:Earth work in excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
An old bridge on River Markanda at village Jhansa was constructed by this department during the construction of the Narwana Branch. This bridge is now in a deteriorated condition and has outlived its useful life. During the recent flood season, the
S/o and C/o stone boulders of requisite size from approved quarry to site of work as per PWD specification No. 3.31 read with 23.8 and 23.9 loading, unloading and stacking as per recommended committee rates for the year 2024-25 for Ambala, Panchkula, Kurukshetra and Kaithal.
Repair of Road from Kaikala Rail station to Kanakpur bridge at Kaikala, Baramba and Kanakpur village under Kaikala and Dwarhatta G.P. in the District of Hooghly.
Repair to HL Bridge over river Salki on KainjharNuasahi road such as Berm Concrete and Protection wall at Ch 2/800Km for the year 2025-26
Earthwork in excavation of foundation in hard soil within the initial lead and lift includimg rough dressing and breaking clods with cost and conveyance of all materials royalty and taxes of all materials cost of labour T&P required for the work etc.complete as per the direction of the Engineer-in-Charge
Repair of the short bridge and approach road damaged due to heavy rain at km 0.50 of the Byahatti-Ingalahalli district main road in Hubballi taluk.
Repair of the short bridge and approach road damaged due to heavy rain at km 0.50 of the Byahatti-Ingalahalli district main road in Hubballi taluk.