Loading…
Loading…
20,168 results • Best match
ZILA SCHOOL MORE TO BRIDGE BEHIND HOSPITAL ROAD REPAIR 500MTR in ward no 3,Scheme/ Project(s) Id. No.APAS/01/017/95/0007 Priority Sequence No.7
2.00 AZAD HIND CO-OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LIMITED (GSTN-NA) BID ID -10052951 250000.00 1.00 252500.00 Two Lakh Fifty Two Thousand Five Hundred
Repair and maintenance of coal transportation CC Road from Subhash chowk to old weigh bridge outside siding of Approach Road inside siding under Burhar Sharda Sub Area
Dry Lean Cement Concrete Sub- base: Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine... less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported ...
Repairs to Major Bridge on road Starting from Sh 201 to Yamekond Shirasangi Kine Nesari Hadalage Kowad Hosur up to State Border MDR 61 Km 25/625 (Kowad Bridge) Tal-Chandgad, Dist-Kolhapur
Construction of 2nos-1.50 m Span RCC Slab Culvert at Chainage 0.050 km and 2.250 km with Slope Stabilisation work to protect landslide at different stretches from 0.00 Km to 2.400 Km of Happy New year Bridge to Goke Road under Goke I GP, Darjeeling
Construction of Bridge Cum Barrage across Halla near Survey No.50/1 of Smt. Shantavva Mang of Malapur Village in Mudhol Taluk of Bagalkot District.
CODE 06 Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works &other parallel works from 0.50m to 3.50 m height. Th... 191.07 Cum
Widening and Strengthening of Golwaghat to Jhinghaghat (Old N.H. OD-0099) Ch. 0.00 to Ch. 1.850 (4 Lane with Pave Shoulder) and Construction of a Parallel 2 Lane Bridge near the already constructed bridge on the Saryu River in Financial Year 2025-26.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. MORTH Clause 3.13 304 B.