Loading…
Loading…
20,256 results • Best match
Urgent repair of severely damaged wooden bridge near House of Badal Sahoo over Debi Khal at Mouza - Dubrajpur, G.P.-Mohar-11No in Block and P.S.-Sabang, Dist- Paschim Medinipur.
3.00 S.B. CONSTRUCTION CONTRACTOR (GSTN-NA) BID ID -8227611 331698.00 2.00 338331.96 Three Lakh Thirty Eight Thousand Three Hundred and Thirty One
Construction of Bridge 3x17m Well foundation 5x6x5m RCC Box Culvert and 1x8x4m RCC Box culvert in Widening and Strengthening of Mainpuri Sirsaganj MDR
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres
Strengt. of Road (Resurfacing Work of 45M Wide Road ESS T-Point Sec-135 To Irrigation Drain Bridge 168 and P/L Bitumen Mastic on Sec-132 to irrigation drain bridge Sec-168 all cuts 45M Wide Road Along Exp.Sec-132 To 135) Noida.
... binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site , laying with a hydrostatic paver finisher with sensor control to the required grade, ...
Construction of Foot Bridge(kalu sanka) to the halla for Public near ST Colony akkamma temple at varkodu village in M Guddekoppa GP of HosanagaraTaluk, Shivamogga dist.
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. ...
as per tender documents
CONSTRUCTION OF BRIDGE OVER GADHI RIVER FROM FINAL PLOT NO. 506, PANVEL SIDE TO KARANJADE SEWAGE TREATMENT PLANT NEAR URAN -PANVEL HIGHWAY.
Construction of H,L. Bridge over Sunamukhi river at 1.300 Km on IDCO road to Godhama (Gosala) road in the District of Pun under SBY for the year 2024-25
... chipping of all complete as per clause 501, 502,503 & 516 of MoRT&H Specification for road & bridge work (5th revision), followed by asphaltic concrete to be laid in two layers of 25mm thick... drawing & technical specification Clause No 503 & 507 of MoRT&H specifications for road & Bridge work (5th revision) and as per direction of the Engineer-in-charge.